Sections 1 and 3 Continued
All of the columns in section 1, with the exception of two columns on the northwest corner, have been placed. The corrugated safety decking continues to be scattered on levels
The ironworkers are installing a BRB running diagonally from the floor of level “A” to the “A” level ceiling. Looking down on the decking there is only one more row of columns along the south wall that needs to be lifted into place. Once that is completed columns will