The Measure of a Hospital: A Construction Timeline of the LLU Campus Hospitals Construction Site, Construction Update Vision 2020, Down in the Pit, Featured Image, Weekly Construction Blog
Construction Site, Construction Techniques, Construction Update Vision 2020, Down in the Pit, Featured Image, Weekly Construction Blog The Week of March 4, 2018 — Anchoring the Steel Support (Spline) Beams to the Isolators in Section 2, Welding and Decking. With the start of this week, the steel skeleton in section one (1) reached the third floor. Section three (3) will reach the third floor by midweek.... Read More