The Week of February 24, 2020 — Back on the Terrace Again, and Back to the North Yard and the Galleria Campus History
Campus History From Doors to Countertops: Signs of Finish Work on the Second Floor. Plus, Some Nursing Stations are Installed in the Emergency Department The featured image is of the control rooms for two of the three CT Scans, which are located in the Ultrasound and CT Scan quadrant.... Read More
Campus History The Week of February 17, 2020 — Rough Grade, Rebar, the Roof and More On the Southwest side of the construction where the Children’s Emergency Department (ED) is located Premiere Engineering & Grading has begun the backfill and rough... Read More
Campus History The Week of February 10, 2019 — Severe WINDS, Windows, and a Little R & R The featured image for this week is of the east elevation of the Adult Hospital tower. The aerial lifts were shut down because of the... Read More
Campus History The West Connector Link Gets Glass Panels…Welders Secure the Galleria Frame…, and MRI RF Shielding Begins The day after the winds had subsided, Tower Glass began installing the glass panels on the west connector bridge that links the second and third... Read More