The West Connector Link Gets Glass Panels…Welders Secure the Galleria Frame…, and MRI RF Shielding Begins

The West Connector Link Gets Glass Panels…Welders Secure the Galleria Frame…, and MRI RF Shielding Begins

The day after the winds had subsided, Tower Glass began installing the glass panels on the west connector bridge that links the second and third floors of the existing Loma Linda University Medical Center and Children’s Hospital to level two (2) and level three (3) of the podium supporting the replacement hospital towers presently under construction.

The north side of the connector bridge, approaching the window panel staging yard.
The window installation staging yard.
The staging yard as viewed from the second tier of the corridor.
Installation of the window panels began around 7:30 AM.
Setting a panel along the second tier corridor.
Share This
Dennis E. Park, MA
After graduate school Dennis accepted a position at Loma Linda University. He worked there for 42 years in the areas of administration and financial management, also teaching accounting and management to dietetic students at the School of Public Health. Through the years Dennis has chronicled the growth of the campus, including the construction of the Drayson Center and the Centennial Complex and the razing of Gentry Gym. He is the author of "The Mound City Chronicles: A Pictorial History of Loma Linda University, A Health Sciences Institution 1905 - 2005." dEp 09.30.2016 🔨
1 Comment
    • Dennis Schall

    when is the first floor pour of the sides of the old/new connector scheduled.