The Week of October 26, 2020 — Despite High Winds, Brush Fires, Power Outages, COVID-19; Work In and Around the Dennis and Carol Troesh Medical Campus Ramps Up.
The featured image for this blog is one that is close to everyone’s stomach — the Cafeteria, which is really taking shape as the project nears the end. The Cafeteria and Dining room are located on the first floor in the northeast corner of the podium.
Landscaping of the site has begun. Last week a few boxed trees had arrived. Today, more boxed trees were being offloaded. At the corner of Anderson Street and Barton Road, a number of boxed trees had been lowered into place. Things are moving along.