Campus History, Construction Site, Current Updates, Weekly Construction Blog The Week of December 3, 2018 — The Week Before the Topping Off Ceremony: All Hands on Deck We know that the topping off of the project is near. The ceremony will be held and viewed from the top of parking structure P4,... Read More
Blog, Campus History, Construction Site, Current Updates The Metamorphous of Barton Road and Environs Through the Decades as Viewed From Loma Vista Drive The well traveled Barton Road has gone though some changes through the decades. The feature image is of Barton Road taken around 1925 from a... Read More
Campus History 360 º Over the Loma Linda University Campus Transformation Project For the last four months, I have bemoaned the fact that my 360fly camera had disappeared. During that time, I searched high and low, but... Read More
Campus History The Week of November 26, 2018 — Setting Steel on the East Wing and Elevator Tower Continues On the evening (4:28 PM) of November 25, 2018, the mighty steel frame stoically stood above the Loma Linda University campus as the top floors... Read More
Campus History Let Us Give Thanks For All of Our Blessings ~ GIVING THANKS ~ AS WE GATHER AROUND OUR THANKSGIVING TABLES THIS YEAR, LET US REMEMBER IN A SPECIAL WAY THOSE WHO LOST THEIR HOMES... Read More
Campus History The Week of November 19, 2018 — Yard Work, The Elevator Tower, and an Instructive Field Trip to the 14th Floor Because of the Thanksgiving Holiday, this will be a short work week. The ironworkers will begin the week by building out and up the Elevator... Read More
Campus History How do They do That? Hanging a GFRC Panel Under an Overhang The featured image for this blog is of the northwest corner of the Adult Hospital tower. It is under the overhang that the ironworkers have... Read More
Campus History How Do They Do That? Lower a Large Piece of Mechanical Equipment Below Grande Without Elevators Months ago after the base isolators were set, work began on the cap slabs that capped off the foundation walls at grade. After the concrete... Read More
Campus History The Week of November 12, 2018 — Assignment: Setting and Hanging Steel on the North Section of the West Wing And so, we will start the beginning of the work week, the same way it ended: Working on the 15th floor’s west wing. The construction... Read More
Campus History Saluting Our Heroes and Veterans on Veterans Day 2018 The more we sweat in peace the less we bleed in war. — Vijaya Lakshmi Pandit In honor of Veterans Day, the construction site... Read More