Blog, Campus History, Construction Site, Current Updates The Metamorphous of Barton Road and Environs Through the Decades as Viewed From Loma Vista Drive The well traveled Barton Road has gone though some changes through the decades. The feature image is of Barton Road taken around 1925 from a... Read More
Campus History, Current Updates, How do They do That? Overlay — The Landscape is Morphing, but The Purpose is the Same Overlay — Blending the Old with the New What do you get when you overlay a September 27, 2018, photo over a 2004 photo (approximate... Read More
Blog, Construction Site, Current Updates, Up on the Steel, Weekly Construction Blog The Week of September 24, 2018 (Week 123) — Hanging the Prefab Exterior Curtain Walls A photo collage of the Loma Linda University Campus Transformation Project: May 22, 2016 – September 26, 2018: On the grand scale of time and... Read More
Construction Site, Construction Update Vision 2020, Current Updates The Week of September 16, 2018 — More Columns to be Set on the Adult Hospital Tower The east elevation as seen at twilight on the eve of week 122. Week 122 will be another busy week at the construction site. Although... Read More
Construction Site, Construction Techniques, Construction Update Vision 2020, Current Updates, Weekly Construction Blog The Week of August 19, 2018 — The East Elevation is a Changin’ By mid morning on Monday, one could definitely see a tower rising on the north side of the podium. As I often do on my... Read More
Blog, Construction Site, Current Updates, Up on the Steel The Aerial Lift aka Man Lift, or Buck Lift — A View From Within the Car On any given day, while I’m on site, I may ride the aerial lift two or three times. Sometimes Gordon. the operator of the car,... Read More
Blog, Construction Site, Current Updates The Replacement Hospitals Floor by Floor as Seen From Parking Structure P4 Several weeks ago, I stopped the car on the third floor of the parking structure P4 to take a photo of the construction site. About... Read More
Blog, Construction Site, Current Updates, Helicopters The Week of July 16, 2018 — Construction on the Adult Hospital Tower Has Begun [one_half][/one_half]A wide-angle screen capture showing the eleven (11) columns set today (07.16.18) on the west end of the the Adult Hospital Tower. from the LLU... Read More
Construction Techniques, Current Updates, Featured Video, How do They do That?, Inside the Building How do they do that? Magnificent, Marvelous, Machines–the Power-Floats, a Video Every time I see the power-floats in action, I am reminded of the bumper cars or hover cars at the county fair. I caught these... Read More
Blog, Construction Site, Current Updates, Inside the Building On July 5, 2018, Another Important Milestone Was Achieved! [edsanimate_start entry_animation_type= “fadeInUp” entry_delay= “3” entry_duration= “0.5” entry_timing= “linear” exit_animation_type= “” exit_delay= “” exit_duration= “” exit_timing= “” animation_repeat= “3” keep= “yes” animate_on= “load” scroll_offset= “”... Read More