One summer day in 2015, surveyors stealthily arrived and parked their truck near the Medical Center entrance. The surveyors hauled out the tools of their...
A closeup of one of the “Mary M” apartment units, which is also slated for demolition. The remaining rubble of the smaller unit to the east provides an...
Along the south wall, an excavator begins excavation of the last tier. Overlooking the construction pit from the south shoring wall, Project Superintendent, Max Klingler,...
The strange looking spool-like objects protruding from the shoring wall, between the soldier pilings, are ducting caps to various sized pipes, which run through the...
In the winter of 2014, construction workers began to build these reinforced cement columns on the east side of Campus Street opposite the northeast end...
April 12, 2016, was the day the Anderson Street entrance closed, which caused much confusion for patients and visitors alike. Although new direction signs directing...