Architecture, Construction Site, Construction Update Vision 2020 The East Elevation: the Central Core and its Penultimate GFRC Panel Remember when the steel towers reached their apex? It was nearly five-month ago when we would gaze up toward the east elevation of the two... Read More
Architecture, Construction Update Vision 2020 Roof Lines — As Viewed From the Southeast Now that the majority of skin (windows and GFRC Panels) cover the steel frame (as viewed from the southeast corner rising above Barton Road and... Read More
Campus History, Construction Site, Construction Update Vision 2020, Weekly Construction Blog The Week of May 13, 2019 — Windows, Gravel, Caissons, a Scaffold, Restrooms, and an Elevator Pit This week we pretty much begin where we left off last week: just more of the same — a little of this and more of... Read More
Construction Site, Construction Update Vision 2020, Featured Posts Loma Linda University Health: Real-Time Construction Webcams http://webcams.llumc.edu/tl201082.html For a unique perspective of the construction in real-time, visitors to this site may want to click on the above link, which goes directly... Read More
Construction Update Vision 2020, Inside the Building, Weekly Construction Blog The Week of May 6, 2019: A Little of This and That — From Grade to the Top; From the Exterior to the Interior The featured image for this week is a photo of the long east-west corridor that bisects the first floor. Some of the allocated space to... Read More
Construction Site, Construction Update Vision 2020 More Pits Are Coming to the South Side of the Construction Site For Utility Support Systems — Pit No. 1: for Dometic Water Tanks Upon arriving on the roof of the Adult Hospital tower, I made my way over to the southeast corner where the glazers were preparing to... Read More
Construction Site, Construction Update Vision 2020, Current Updates Cascading Rows of Color and Other Magical Mystical Moments of the Children’s Hospital Tower The mood of the Dichroic glass on Children’s Hospital tower is ever changing. The glass reflects mother nature’s current state of mind Read More
Construction Site, Construction Update Vision 2020, Weekly Construction Blog The Week of January 14, 2019 — A New Crane, Rain, Air Handlers, More Rain, and Mud Despite the rain, the Hill Crane Company rolled into the south yard off of Barton Road, parallel to the Children’s Hospital tower, a large crane... Read More
Blog, Campus History, Construction Site, Construction Update Vision 2020 A New Landmark in the Inland Empire: All Towers Have Now Topped Out — The Profiles of the New Hospitals are Set. A New Landmark In the Inland Empire News Flash! It is official: With the exception of a few beams on the north side of the... Read More